- Flexera Community
- :
- FlexNet Manager
- :
- FlexNet Manager Forum
- :
- Re: Bulk updates of asset records
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Subscribe
- Mute
- Printer Friendly Page
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
You can use the Business Adapter Studio to build an adapter that reads such a spreadsheet. Then the Business Importer can be scheduled to load the data at a time of your choosing. You can connect to a spreadsheet or a database, as required.
Natalie@Flexera
Senior Product Manager
I don’t speak for Flexera, and we should all be grateful for that
This thread has been automatically locked due to inactivity.
To continue the discussion, please start a new thread.
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
You can use the Business Adapter Studio to build an adapter that reads such a spreadsheet. Then the Business Importer can be scheduled to load the data at a time of your choosing. You can connect to a spreadsheet or a database, as required.
Natalie@Flexera
Senior Product Manager
I don’t speak for Flexera, and we should all be grateful for that
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
I have a similar issue and have just seen this after posting a similar request. I also used to be a HPAM user and use Connect-IT. I know our Admin uses 'the beacon' to bulk upload records, but each time it means troubling him and waiting for him to get round to it.
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
As soon as you (your colleague) have developed an adapter that reads such a spreadsheet the Business Importer can be scheduled to load the data at a time of your choosing and with a given frequency, e.g. every day at 01:00 AM.
I.e. if you have another process (or manually) create the spreadsheet with data to be bulk updated and/or inserted and copied it to this pre-agreed folder from where the Business Importer would find it and process its data.
Thanks,
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
Thanks, @JohnSorensenDK . Is there a link to a user guide for how we run the Business Importer, please? Currently I receive a weekly spreadsheet of what HW assets have been installed and which have been replaced. I load this in MS Access and that produces two output files from this data: 1) a list of new records to create, 2) a list of records to set the status to 'Disposed'.
Each Access export file is an XLS sheet with all the field names set to those neede by my Admin to load through the beacon. So the process to produce standard consistent sheets with the right column headings is already there.
I spoke to my Admin and I'm not sure hw knows about the Importer, unless him using 'the Beacon' is the same thing.
Thanks.
- Mark as New
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
You may want to refer to Using FlexNet Business Adapters and then also potentially to the Business Adapter Practice Guide for developing adapters and seeing some examples.
Thanks,
